dc.description.abstract In the introduction of this article the purpose and operation principle of railway interlocking systems is briefly explained. Further there are presented results of an analysis, which aim was to prove validity of a formula recommended by EN 50129 standard for a hazard rate calculation of the interlocking systems with a redundant structure 2oo2. Hazard rate was calculated by two independent ways, namely for different failure rates of single channels and for a different safe-down time. In the first case the formula presented in EN 50129 was used, in the latter case a calculation was carried out by RBD method. Results of both methods were matched. In most cases both results coincide. Greater diversions arise only in such cases, when a safe-down time of a single fault is comparable in order of magnitude with a mean time to failure of a single channel of the redundant structure. This can occur for instance during long term system storage, or if an undetected failure occurs during a system operation. Possibility of an undetected failure is not quantitatively captured in EN 50129 standard (each single random failure is considered to be detected at the end of the test), therefore the last aim of the work was to analyse in detail a mechanism of origin, detection and negation of double random faults. The results of this analysis can be used for a quantitative evaluation of the impact of undetected random failures on a hazard rate of a redundant structure 2 out of 2. The main risk for the technical safety of redundant systems, besides common cause failures, are undetected failures. One point of this paper is a recommendation that the data comparison and the fault negation should be carried out in such a way that would minimize or completely eliminate the possibility of undetected malfunction of these key safety functions. cze
dc.format p. 69-85
dc.language.iso eng
dc.publisher Univerzita Pardubice cze
dc.relation.ispartof Scientific papers of the University of Pardubice. Series B, Jan Perner Transport Faculty. 15 (2009)
dc.subject railway cze
dc.subject interlocking systems cze
dc.subject hazard rate calculation cze
dc.title Hazard rate of redundant structure 2 out of 2 cze
dc.type Article cze
dc.identifier.signature 47578-15
dc.peerreviewed yes
dc.publicationstatus published


Tento záznam se objevuje v následujících kolekcích

Zobrazit minimální záznam

Vyhledávání


Rozšířené hledání

Procházet

Můj účet